Our Solar Installation Process

Project Design

We create a solar design per your specifications and energy requirements

Permitting

Your approved design will be sent to the city permitting department, once approved, typically 3-5 days, we will schedule your installation.

Installation

Typical installation timeframe is from 30-40 days from the date of the signed agreement.

System Turn-On

Utility signoff is typically within 10 days of final city inspection where your system will be turned on to start saving.

Installer Resources

Solar Installer Resources provides easy-to-use guides and support for installing solar panels. From planning to maintenance, we help you every step of the way to make sure your solar project is successful.

CACTUS SOLAR

Discover Solar Products

Available Solar Panels

Q.PEAK DUO BLK ML-G10+ Enduring High Performance

REC Alpha 400

Panasonic Solar Panel

Panasonic EverVolt HJT 400 W module, 132 half-cell, 30mm, black frame, black backsheet, MC4 connector

This product is supplied with MC4 connectors

Black Backsheet & Frame (Mono)

Aesthetic appearance for residential systems

Available Solar inverters

IQ8M Microinverter (MC4)

SOL-ARK 15K-2P

UL: Limitless 15K-LV

“One inverter to RULE them all!” The Generator Eliminator

Fronius Primo 15.0-1 15kW 240/208VAC TL Inverter

SMA Smart Energy 3.6

The 1-phase 2-in-1 hybrid inverter by SMA